0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Change Order Provisions under National and International Standard Forms of Contract

Auteur(s): (Associate Professor and Construction Engineering and Management Program Coordinator, Dept. of Civil and Environmental Engineering, Univ. of Tennessee–Knoxville, 851 Neyland Dr., 417 John D. Tickle Bldg., Knoxville, TN 37996 (corresponding author).)
(Contracts Manager, FCIArb, Dar Al Mimar Group; Instructor, Engineering and Sciences Services, American Univ., 1 Abu Bakr El Seddik St., Dokki, Giza, Cairo, Egypt.)
(Undergraduate Student, Dept. of Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., Walker Engineering Bldg., Mississippi State, MS 39762.)
(Undergraduate Student, Dept. of Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., Walker Engineering Bldg., Mississippi State, MS 39762.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 8
Page(s): 03716001
DOI: 10.1061/(asce)la.1943-4170.0000187
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)la.1943-4170.0000187.
  • Informations
    sur cette fiche
  • Reference-ID
    10579813
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine