Challenges and strategies involved in designing and constructing a 6 km immersed tunnel: A case study of the Hong Kong–Zhuhai–Macao Bridge
Author(s): |
Zhi-nan Hu
Yong-li Xie Jun Wang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, August 2015, v. 50 |
Page(s): | 171-177 |
DOI: | 10.1016/j.tust.2015.07.011 |
Structures and Projects
Geographic Locations
- About this
data sheet - Reference-ID
10089965 - Published on:
10/10/2018 - Last updated on:
18/10/2018