0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Causes of cost overruns in transport infrastructure projects in Asia

Their significance and relationship with project size

This publication lists 47 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10367479
  • Published on:
    27/08/2019
  • Last updated on:
    27/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine