0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Causes of cost overruns in transport infrastructure projects in Asia

Their significance and relationship with project size

Author(s):

Medium: journal article
Language(s): English
Published in: Built Environment Project and Asset Management, , n. 2, v. 2
Page(s): 195-216
DOI: 10.1108/20441241211280873

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/20441241211280873.
  • About this
    data sheet
  • Reference-ID
    10367479
  • Published on:
    27/08/2019
  • Last updated on:
    27/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine