Bohrpfahlwände als Baugrubenverbau und Kammerwandbauteil der neuen Schleuse Dörverden
Author(s): |
Joachim Saathoff
Regina Kauther Hilmar Müller Markus Herten |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Beton- und Stahlbetonbau, April 2013, n. 4, v. 108 |
Page(s): | 276-281 |
DOI: | 10.1002/best.201200077 |
Abstract: |
Dual use of a secant bored pile wall at the new lock of Dörverden: construction pit lining and chamber wallIn Dörverden an old damaged lock needed to be replaced by a newly constructed lock. In the design phase various construction concepts were examined regarding economic, technical and practical aspects. After thorough consideration the Federal Waterway Administration decided in favour of an innovative construction concept: The construction pit lining consisting of a back-tied secant bored pile wall was fully integrated into the chamber wall as a permanent load-bearing element. The water-facing part of the chamber wall was designed as a concrete shell. The concrete shell was affixed to the pile wall by bolts and is intended to secure essential practical properties and durability of the construction. |
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10068743 - Published on:
15/05/2013 - Last updated on:
13/08/2014