0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM-based framework to quantify delays and cost overruns due to changes in construction projects

This publication has been cited in the following 8 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10678490
  • Published on:
    17/06/2022
  • Last updated on:
    17/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine