0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM-based framework to quantify delays and cost overruns due to changes in construction projects

Author(s):
ORCID
Medium: journal article
Language(s): English
Published in: Asian Journal of Civil Engineering, , n. 5, v. 23
Page(s): 707-725
DOI: 10.1007/s42107-022-00451-x
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s42107-022-00451-x.
  • About this
    data sheet
  • Reference-ID
    10678490
  • Published on:
    17/06/2022
  • Last updated on:
    17/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine