BIM-Based Combination of Takt Time and Discrete Event Simulation for Implementing Just in Time in Construction Scheduling under Constraints
Author(s): |
Saman Abbasi
Katayoon Taghizade Esmatullah Noorzai |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, December 2020, n. 12, v. 146 |
Page(s): | 04020143 |
DOI: | 10.1061/(asce)co.1943-7862.0001940 |
- About this
data sheet - Reference-ID
10446905 - Published on:
19/10/2020 - Last updated on:
19/10/2020