BIM-Based Combination of Takt Time and Discrete Event Simulation for Implementing Just in Time in Construction Scheduling under Constraints
Auteur(s): |
Saman Abbasi
Katayoon Taghizade Esmatullah Noorzai |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, décembre 2020, n. 12, v. 146 |
Page(s): | 04020143 |
DOI: | 10.1061/(asce)co.1943-7862.0001940 |
- Informations
sur cette fiche - Reference-ID
10446905 - Publié(e) le:
19.10.2020 - Modifié(e) le:
19.10.2020