Beitrag zur Entwicklung der Querschnittsgestaltung im Verbundbrückenbau

Author(s):

Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 3, v. 80
Page(s): 185-197
DOI: 10.1002/stab.201101405
Abstract:

On the development of sections in composite bridges.

A comprehensive theory of composite construction was established in Germany by Sattler in 1953. The theoretical image of the composite section with a superior concrete slab and a lower metallic structure was shaped in addition to the analytical resolution. Theory and graphical representation were going to be known together in Europe. This figure was repeated in all theoretical and academic publications, so becoming an authentic icon of the composite section. Its translation to the bridge deck in flexion was obvious: the superior slab defines the tread platform, while the metallic structure was left off-hook at the bottom.
Nevertheless, in continuous decks the section is not optimal at all in zones of negative bending moments. But the overcoming of the graphical representation of the theory did not happen immediately. It was produced after a process in which several European countries played an active role and where different mechanisms of technological transference were developed.
One approach to this overcoming is the "double composite action", with a lower concrete slab in areas of a negative bending moment. The first accomplishments, a bridge in Orasje built in 1968 with 134 m span, as well as the publications of the system proposed by Fabrizio de Miranda in 1971 did not extend nor had continuity. Spanish bridges by Fernández Ordoñez and Martínez Calzón used double composite action for the first time in 1979. The German team of Leonhard, Andrä und partners, has used it since the end of the 1980's to solve bridges of great span. Once the technology has been well known thanks to the ASCE International Congress and the Spanish International Meetings organised by the "Colegio de Ingenieros de Caminos", double composite action has been integrated well into the structural vocabulary everywhere.
In France the approach was different. What Michel Virlogeux calls "double floor composite section" was reached as an evolution of prestressed concrete bridges. In an experimental process widely known, the external prestressing allows weight reduction by diminishing the thickness of the concrete webs. The following step, in the 1980's, was the substitution of the webs by metallic elements: stiffened plates, trusses or folded plates. A direct result of this development is the Brass de la Plaine Bridge in the Reunion Island in 2001 with 280 m span.
Both approaches have contributed to a freedom of design in composite construction in steel and concrete today.

Keywords:
composite bridge construction history double composite construction hybride composite structure external prestressing
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.201101405.
  • About this
    data sheet
  • Reference-ID
    10064828
  • Published on:
    05/04/2011
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine