Bauzeitverzögerungen bei Stahlbauprojekten - Rechtlicher Rahmen, Konfliktprävention und Konfliktlösung

Author(s):
Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 1, v. 84
Page(s): 19-21
DOI: 10.1002/stab.201510231
Abstract:

Delays in the steel construction progress - Legal framework, conflict prevention and conflict resolution.

Steel construction heavily depends on employers' planning, provision of ground and material, coordination of the construction progress. Due to changes and additional requests or other interferences in the construction process, it often comes to time shifts or extensions and thus to additional costs for the contractor. Since the erection of steel construction comes at the very end precedent delays may cumulate. The Contractor may base his claims on three main legal grounds but needs to be aware of different legal requirements. An early contract management and a good documentation are essential. Conflicts resulting there from can be avoided by the forward-looking drafting of the contract, including stipulations on alternative dispute resolutions.

Keywords:
erection assembly arbitration construction disturbance obligation duty to inform
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.201510231.
  • About this
    data sheet
  • Reference-ID
    10071153
  • Published on:
    19/01/2015
  • Last updated on:
    04/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine