0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Automated progress tracking using 4D schedule and 3D sensing technologies

Author(s):



Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 22
Page(s): 414-421
DOI: 10.1016/j.autcon.2011.10.003
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2011.10.003.
  • About this
    data sheet
  • Reference-ID
    10190047
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine