-
Ryu, JuHyeong / McFarland, Tasha / Haas, Carl T. / Abdel-Rahman, Eihab (2022): Automatic clustering of proper working postures for phases of movement. In: Automation in Construction, v. 138 (June 2022).
https://doi.org/10.1016/j.autcon.2022.104223
-
Ryu, JuHyeong / Diraneyya, Mohsen M. / Haas, Carl T. / Abdel-Rahman, Eihab (2021): Analysis of the Limits of Automated Rule-Based Ergonomic Assessment in Bricklaying. In: Journal of Construction Engineering and Management, v. 147, n. 2 (February 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0001978
-
Ryu, JuHyeong / Alwasel, Abdullatif / Haas, Carl T. / Abdel-Rahman, Eihab (2020): Analysis of Relationships between Body Load and Training, Work Methods, and Work Rate: Overcoming the Novice Mason’s Risk Hump. In: Journal of Construction Engineering and Management, v. 146, n. 8 (August 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001889
-
Enshassi, Mohammed S. A. / Walbridge, Scott / West, Jeffrey S. / Haas, Carl T. (2020): Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. In: Journal of Construction Engineering and Management, v. 146, n. 2 (February 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001747
-
Shahtaheri, Maryam / Haas, Carl T. / Rashedi, Roozbeh (2017): Applying Very Large Scale Integration Reliability Theory for Understanding the Impacts of Type II Risks on Megaprojects. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (July 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000504
-
Haas, Carl T. / Kim, Young‐Suk (2002): Automation in infrastructure construction. In: Construction Innovation, v. 2, n. 3 (September 2002).
https://doi.org/10.1108/14714170210814766
-
Ahmed, Mahmoud Fouad / Haas, Carl T. / Haas, Ralph (2014): Automatic Detection of Cylindrical Objects in Built Facilities. In: Journal of Computing in Civil Engineering, v. 28, n. 3 (May 2014).
https://doi.org/10.1061/(asce)cp.1943-5487.0000329
-
Bosché, Frédéric / Haas, Carl T. / Akinci, Burcu (2009): Automated Recognition of 3D CAD Objects in Site Laser Scans for Project 3D Status Visualization and Performance Control. In: Journal of Computing in Civil Engineering, v. 23, n. 6 (November 2009).
https://doi.org/10.1061/(asce)0887-3801(2009)23:6(311)
-
Kim, Hyoungkwan / Rauch, Alan F. / Haas, Carl T. (2004): Automated Quality Assessment of Stone Aggregates Based on Laser Imaging and a Neural Network. In: Journal of Computing in Civil Engineering, v. 18, n. 1 (January 2004).
https://doi.org/10.1061/(asce)0887-3801(2004)18:1(58)
-
Kim, Hyoungkwan / Haas, Carl T. / Rauch, Alan F. / Browne, Craig (2002): Dimensional Ratios for Stone Aggregates from Three-Dimensional Laser Scans. In: Journal of Computing in Civil Engineering, v. 16, n. 3 (July 2002).
https://doi.org/10.1061/(asce)0887-3801(2002)16:3(175)
-
Shahi, Arash / Safa, Mahdi / Haas, Carl T. / West, Jeffrey S. (2015): Data Fusion Process Management for Automated Construction Progress Estimation. In: Journal of Computing in Civil Engineering, v. 29, n. 6 (November 2015).
https://doi.org/10.1061/(asce)cp.1943-5487.0000436
-
Nahangi, Mohammad / Haas, Carl T. / West, Jeffrey / Walbridge, Scott (2016): Automatic Realignment of Defective Assemblies Using an Inverse Kinematics Analogy. In: Journal of Computing in Civil Engineering, v. 30, n. 2 (March 2016).
https://doi.org/10.1061/(asce)cp.1943-5487.0000477
-
Ueki, Masashi / Haas, Carl T. / Seo, Jongwon (1999): Decision Tool for Microtunneling Method Selection. In: Journal of Construction Engineering and Management, v. 125, n. 2 (March 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:2(123)
-
LeBlond, David / Owen, Frank / Gibson, G. Edward / Haas, Carl T. / Traver, Al E. (1998): Control Improvement for Advanced Construction Equipment. In: Journal of Construction Engineering and Management, v. 124, n. 4 (July 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:4(289)
-
Song, Jongchul / Fagerlund, Walter R. / Haas, Carl T. / Tatum, Clyde B. / Vanegas, Jorge A. (2005): Considering Prework on Industrial Projects. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(723)
-
Gouett, Michael C. / Haas, Carl T. / Goodrum, Paul M. / Caldas, Carlos H. (2011): Activity Analysis for Direct-Work Rate Improvement in Construction. In: Journal of Construction Engineering and Management, v. 137, n. 12 (December 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000375
-
Gomar, Jorge E. / Haas, Carl T. / Morton, David P. (2002): Assignment and Allocation Optimization of Partially Multiskilled Workforce. In: Journal of Construction Engineering and Management, v. 128, n. 2 (April 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:2(103)
-
Zhang, Di / Haas, Carl T. / Goodrum, Paul M. / Caldas, Carlos H. / Granger, Robin (2012): Construction Small-Projects Rework Reduction for Capital Facilities. In: Journal of Construction Engineering and Management, v. 138, n. 12 (December 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000552
-
Kim, Hyoungkwan / Haas, Carl T. / Rauch, Alan F. / Browne, Craig (2003): 3D Image Segmentation of Aggregates from Laser Profiling. In: Computer-Aided Civil and Infrastructure Engineering, v. 18, n. 4 (July 2003).
https://doi.org/10.1111/1467-8667.00315
-
Grau, David / Caldas, Carlos H. / Haas, Carl T. / Goodrum, Paul M. / Gong, Jie (2009): Assessing the impact of materials tracking technologies on construction craft productivity. In: Automation in Construction, v. 18, n. 7 (November 2009).
https://doi.org/10.1016/j.autcon.2009.04.001
-
Turkan, Yelda / Bosché, Frédéric / Haas, Carl T. / Haas, Ralph (2012): Automated progress tracking using 4D schedule and 3D sensing technologies. In: Automation in Construction, v. 22 (March 2012).
https://doi.org/10.1016/j.autcon.2011.10.003
-
Song, Jongchul / Haas, Carl T. / Caldas, Carlos / Ergen, Esin / Akinci, Burcu (2006): Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects. In: Automation in Construction, v. 15, n. 2 (March 2006).
https://doi.org/10.1016/j.autcon.2005.03.001
-
Shahi, Arash / Aryan, Afrooz / West, Jeffrey S. / Haas, Carl T. / Haas, Ralph C. G. (2012): Deterioration of UWB positioning during construction. In: Automation in Construction, v. 24 (July 2012).
https://doi.org/10.1016/j.autcon.2012.02.009
-
Safa, Mahdi / Shahi, Arash / Haas, Carl T. / Fiander-McCann, Dawn / Safa, Majeed / Hipel, Keith / MacGillivray, Sandra (2015): Competitive intelligence (CI) for evaluation of construction contractors. In: Automation in Construction, v. 59 (November 2015).
https://doi.org/10.1016/j.autcon.2015.02.009
-
Nahangi, Mohammad / Yeung, Jamie / Haas, Carl T. / Walbridge, Scott / West, Jeffrey (2015): Automated assembly discrepancy feedback using 3D imaging and forward kinematics. In: Automation in Construction, v. 56 (August 2015).
https://doi.org/10.1016/j.autcon.2015.04.005
-
Wang, Yinggang / Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2009): Analysis of Observed Skill Affinity Patterns and Motivation for Multiskilling among Craft Workers in the U.S. Industrial Construction Sector. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000072
-
Wang, Yinggang / Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2008): Craft Training Issues in American Industrial and Commercial Construction. In: Journal of Construction Engineering and Management, v. 134, n. 10 (October 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:10(795)
-
Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2002): The divergence in aggregate and activity estimates of US construction productivity. In: Construction Management and Economics, v. 20, n. 5 (July 2002).
https://doi.org/10.1080/01446190210145868
-
Zhang, Di / Nasir, Hassan / Haas, Carl T. (2017): Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 7 (July 2017).
https://doi.org/10.1139/cjce-2016-0274
-
Nasir, Hassan / Haas, Carl T. / Rankin, Jeff H. / Fayek, Aminah Robinson / Forgues, Daniel / Ruwanpura, Janaka (2012): Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).
https://doi.org/10.1139/l2012-030