Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach

Author(s):

Medium: journal article
Language(s): English
Published in: Journal of Construction Engineering and Management, , n. 1, v. 143
Page(s): 04016086
DOI: 10.1061/(asce)co.1943-7862.0001214
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001214.