Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach
Auteur(s): |
Duanshun Li
Ming Lu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, janvier 2017, n. 1, v. 143 |
Page(s): | 04016086 |
DOI: | 10.1061/(asce)co.1943-7862.0001214 |