0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Automated early estimation of bridge interventions, possession windows and costs

Author(s): ORCID (Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland)
ORCID (Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland)
ORCID (Construction Research Centre, National Research Council, Ottawa, Canada)
ORCID (Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland)
Medium: journal article
Language(s): English
Published in: Infrastructure Asset Management
Page(s): 1-17
DOI: 10.1680/jinam.23.00038
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/jinam.23.00038.
  • About this
    data sheet
  • Reference-ID
    10755514
  • Published on:
    14/01/2024
  • Last updated on:
    14/01/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine