Automated early estimation of bridge interventions, possession windows and costs
Auteur(s): |
Hamed Mehranfar
(Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland)
Bryan T. Adey (Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland) Saviz Moghtadernejad (Construction Research Centre, National Research Council, Ottawa, Canada) Steven Chuo (Institute of Construction and Infrastructure Management, ETH Zürich, Zurich, Switzerland) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Infrastructure Asset Management, septembre 2024, n. 3, v. 11 |
Page(s): | 1-17 |
DOI: | 10.1680/jinam.23.00038 |
- Informations
sur cette fiche - Reference-ID
10755514 - Publié(e) le:
14.01.2024 - Modifié(e) le:
20.09.2024