0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey

This publication has been cited in the following 7 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10311970
  • Published on:
    17/04/2019
  • Last updated on:
    17/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine