0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey

Author(s):

Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , v. 89
Page(s): 157-169
DOI: 10.1016/j.tust.2019.04.001
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2019.04.001.
  • About this
    data sheet
  • Reference-ID
    10311970
  • Published on:
    17/04/2019
  • Last updated on:
    17/04/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine