Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey
Author(s): |
Murat Alp
Ahmet Apaydin |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, July 2019, v. 89 |
Page(s): | 157-169 |
DOI: | 10.1016/j.tust.2019.04.001 |
- About this
data sheet - Reference-ID
10311970 - Published on:
17/04/2019 - Last updated on:
17/04/2019