Anwendung des Herstellkosten/Bauzeit- und Kapazitätsauslastungs-Verfahrens bei der Ermittlung von AGK-Mehrvergütungsansprüchen nach VOB/B - Teil 2
Author(s): |
Ivan C̆adez̆
|
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, March 2015, n. 3, v. 92 |
Page(s): | 201-206 |
DOI: | 10.1002/bate.201400102 |
Abstract: |
Application of the manufacturing costs/construction time-method and the capacity utilization-method for the determination of general costs at claim requests according to VOB/BBased on construction business management characteristics there were two new methods - the manufacturing costs/construction time and the capacity utilization method - for the determination of general costs at claim requests according to § 2 clause 5 and 6 as well as § 6 clause 6 VOB/B introduced. Furthermore two already in the jurisdiction considered methods - the construction work related and the construction time related method - were analyzed. |
Keywords: |
general costs delay in construction manufacturing costs/construction time method capacity utilization method construction work related method construction time related method
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10071636 - Published on:
17/03/2015 - Last updated on:
04/10/2016