0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Animation‐based construction schedule review

Author(s):


Medium: journal article
Language(s): English
Published in: Construction Innovation, , n. 3, v. 1
Page(s): 181-190
DOI: 10.1108/14714170110814596
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/14714170110814596.
  • About this
    data sheet
  • Reference-ID
    10325747
  • Published on:
    21/07/2019
  • Last updated on:
    21/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine