0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

James E. Diekmann

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Fenis, Saeed M. / Diekmann, James E. / Huang, Pei-yu (1995): A GIS‐based pipeline planning system. In: Engineering, Construction and Architectural Management, v. 2, n. 3 (March 1995).

    https://doi.org/10.1108/eb021013

  2. Diekmann, James E. (1981): Cost-Plus Contractor Selection: A Case Study. In: Journal of the Technical Councils of ASCE, v. 107, n. 1 (April 1981).

    https://doi.org/10.1061/JTCAD9.0000076

  3. Songer, Anthony D. / Diekmann, James E. / Rasheed, Khaled‐Al / Hays, Benjamin (2001): Construction scheduling using 3‐D CAD and walk‐thru. In: Construction Innovation, v. 1, n. 3 (September 2001).

    https://doi.org/10.1108/14714170110814604

  4. Songer, Anthony D. / Diekmann, James E. / Karet, Douglas (2001): Animation‐based construction schedule review. In: Construction Innovation, v. 1, n. 3 (September 2001).

    https://doi.org/10.1108/14714170110814596

  5. Kraiem, Zaki M. / Diekmann, James E. (1988): Representing Construction Contract Legal Knowledge. In: Journal of Computing in Civil Engineering, v. 2, n. 2 (April 1988).

    https://doi.org/10.1061/(asce)0887-3801(1988)2:2(202)

  6. Diekmann, James E. / Kraiem, Zaki M. (1990): Uncertain Reasoning in Construction Legal Expert System. In: Journal of Computing in Civil Engineering, v. 4, n. 1 (January 1990).

    https://doi.org/10.1061/(asce)0887-3801(1990)4:1(55)

  7. Diekmann, James E. / Gjertsen, Knut (1992): Site Event Advisor: Expert System for Contract Claims. In: Journal of Computing in Civil Engineering, v. 6, n. 4 (October 1992).

    https://doi.org/10.1061/(asce)0887-3801(1992)6:4(472)

  8. Huang, Pei-yu / Diekmann, James E. / Fenis, Saeed M. (1995): Pipeline Planning System. In: Journal of Computing in Civil Engineering, v. 9, n. 2 (April 1995).

    https://doi.org/10.1061/(asce)0887-3801(1995)9:2(134)

  9. Diekmann, James E. / Peppler, Scott E. (1984): Union and Open Shop Labor Cost Differences. In: Journal of Construction Engineering and Management, v. 110, n. 1 (March 1984).

    https://doi.org/10.1061/(asce)0733-9364(1984)110:1(87)

  10. Diekmann, James E. (1983): Probabilistic Estimating: Mathematics and Applications. In: Journal of Construction Engineering and Management, v. 109, n. 3 (September 1983).

    https://doi.org/10.1061/(asce)0733-9364(1983)109:3(297)

  11. Diekmann, James E. / Kruppenbacher, Timothy A. (1984): Claims Analysis and Computer Reasoning. In: Journal of Construction Engineering and Management, v. 110, n. 4 (December 1984).

    https://doi.org/10.1061/(asce)0733-9364(1984)110:4(391)

  12. Diekmann, James E. / Nelson, Mark C. (1985): Construction Claims: Frequency and Severity. In: Journal of Construction Engineering and Management, v. 111, n. 1 (March 1985).

    https://doi.org/10.1061/(asce)0733-9364(1985)111:1(74)

  13. Kraiem, Zaki M. / Diekmann, James E. (1987): Concurrent Delays in Construction Projects. In: Journal of Construction Engineering and Management, v. 113, n. 4 (December 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:4(591)

  14. Ivanoff, Daniel J. / Diekmann, James E. (1989): Project‐Labor Agreements in Construction Industry. In: Journal of Construction Engineering and Management, v. 115, n. 4 (December 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:4(567)

  15. Diekmann, James E. / Kim, Moonja P. (1992): SuperChange: Expert System for Analysis of Changes Claims. In: Journal of Construction Engineering and Management, v. 118, n. 2 (June 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:2(399)

  16. Diekmann, James E. / Girard, Matthew J. (1995): Are Contract Disputes Predictable?. In: Journal of Construction Engineering and Management, v. 121, n. 4 (December 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:4(355)

  17. Han, Seung H. / Diekmann, James E. (2001): Approaches for Making Risk-Based Go/No-Go Decision for International Projects. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(300)

  18. Chinowsky, Paul S. / Diekmann, James E. (2004): Construction Engineering Management Educators: History and Deteriorating Community. In: Journal of Construction Engineering and Management, v. 130, n. 5 (October 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:5(751)

  19. Diekmann, James E. / Featherman, W. David (1998): Assessing Cost Uncertainty: Lessons from Environmental Restoration Projects. In: Journal of Construction Engineering and Management, v. 124, n. 6 (December 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:6(445)

  20. Blacud, Nicolas A. / Bogus, Susan M. / Diekmann, James E. / Molenaar, Keith R. (2009): Sensitivity of Construction Activities under Design Uncertainty. In: Journal of Construction Engineering and Management, v. 135, n. 3 (March 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:3(199)

  21. Bogus, Susan M. / Molenaar, Keith R. / Diekmann, James E. (2005): Concurrent Engineering Approach to Reducing Design Delivery Time. In: Journal of Construction Engineering and Management, v. 131, n. 11 (November 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1179)

  22. Han, Seung H. / Diekmann, James E. / Ock, Jong H. (2005): Contractor's Risk Attitudes in the Selection of International Construction Projects. In: Journal of Construction Engineering and Management, v. 131, n. 3 (March 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:3(283)

  23. Diekmann, James E. (2007): Past Perfect: Historical Antecedents of Modern Construction Practices. In: Journal of Construction Engineering and Management, v. 133, n. 9 (September 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:9(652)

  24. Bogus, Susan M. / Molenaar, Keith R. / Diekmann, James E. (2006): Strategies for overlapping dependent design activities. In: Construction Management and Economics, v. 24, n. 8 (August 2006).

    https://doi.org/10.1080/01446190600658529

  25. Han, Seung H. / Diekmann, James E. (2001): Making a risk-based bid decision for overseas construction projects. In: Construction Management and Economics, v. 19, n. 8 (December 2001).

    https://doi.org/10.1080/01446190110072860

  26. Al-Tabtabai, Hashem / Diekmann, James E. (1992): Judgemental forecasting in construction projects. In: Construction Management and Economics, v. 10, n. 1 (January 1992).

    https://doi.org/10.1080/01446199200000003

  27. Lee, Jae-Seob / Diekmann, James E. (2011): Delay analysis considering production rate. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 4 (April 2011).

    https://doi.org/10.1139/l11-006

  28. Ock, Jong H. / Han, Seung H. / Park, Hyung K. / Diekmann, James E. (2005): Improving decision quality: a risk-based go/no-go decision for build–operate–transfer (BOT) projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 3 (June 2005).

    https://doi.org/10.1139/l05-002

  29. Han, Seung H. / Diekmann, James E. / Lee, Young / Ock, Jong H. (2004): Multicriteria Financial Portfolio Risk Management for International Projects. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:3(346)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine