Analysis on Influencing Factor of Cost Control of Epc Project Based on the Dematel-ism

Author(s):
Medium: journal article
Language(s): English
Published in: Stavební obzor - Civil Engineering Journal, , n. 1, v. 31
Page(s): 66-84
DOI: 10.14311/cej.2022.01.0006
Abstract:

The paper selects the influencing factors of EPC project’s cost control,analyzes and constructs the model of EPC project’s cost control from the point of view of system engineering,and utilizes the integrating DEMATEL—ISM method to study the relationships between the influencing factors and their impacts on cost control. And it gets the multilevel structure model of the influencing factors of EPC project’s cost control. The results show that project construction management level, procurement system, procurement process and standards project content acceptance and project settlement basis are the direct impacting factors of EPC project’s cost control. The study provides a reference of EPC project’s enterprises to improve project management level,effectively control project cost and achieve project management objectives.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.14311/cej.2022.01.0006.
  • About this
    data sheet
  • Reference-ID
    10665688
  • Published on:
    09/05/2022
  • Last updated on:
    09/05/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine