Analysis on Influencing Factor of Cost Control of Epc Project Based on the Dematel-ism

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Stavební obzor - Civil Engineering Journal, , n. 1, v. 31
Page(s): 66-84
DOI: 10.14311/cej.2022.01.0006
Abstrait:

The paper selects the influencing factors of EPC project’s cost control,analyzes and constructs the model of EPC project’s cost control from the point of view of system engineering,and utilizes the integrating DEMATEL—ISM method to study the relationships between the influencing factors and their impacts on cost control. And it gets the multilevel structure model of the influencing factors of EPC project’s cost control. The results show that project construction management level, procurement system, procurement process and standards project content acceptance and project settlement basis are the direct impacting factors of EPC project’s cost control. The study provides a reference of EPC project’s enterprises to improve project management level,effectively control project cost and achieve project management objectives.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.14311/cej.2022.01.0006.
  • Informations
    sur cette fiche
  • Reference-ID
    10665688
  • Publié(e) le:
    09.05.2022
  • Modifié(e) le:
    09.05.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine