아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석 (Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment)
Author(s): |
Chae-Yong Kim
Jong-Gyu Lee Jae-Yong Lee Soo-Yong Lee |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), February 2010, n. 1, v. 10 |
Page(s): | 213-219 |
DOI: | 10.5345/jkic.2010.10.1.213 |
- About this
data sheet - Reference-ID
10761991 - Published on:
15/03/2024 - Last updated on:
15/03/2024