아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석 (Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment)
Auteur(s): |
Chae-Yong Kim
Jong-Gyu Lee Jae-Yong Lee Soo-Yong Lee |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), février 2010, n. 1, v. 10 |
Page(s): | 213-219 |
DOI: | 10.5345/jkic.2010.10.1.213 |
- Informations
sur cette fiche - Reference-ID
10761991 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024