Analysis of the galleries cracking causes in the backfill area of pumped storage power station based on monitoring and numerical simulation: a case study of Hohhot upper reservoir
Author(s): |
Wen Qiu
(State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China)
Yanlong Li (State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China) Lifeng Wen (State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China) Zheng Si (State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China) Ye Zhang (State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China) Yongtao Duan (PowerChina Beijing Engineering Corporation Limited, Beijing, China) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structural Health Monitoring |
DOI: | 10.1177/14759217241259967 |
- About this
data sheet - Reference-ID
10797462 - Published on:
01/09/2024 - Last updated on:
01/09/2024