0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Analysis of the galleries cracking causes in the backfill area of pumped storage power station based on monitoring and numerical simulation: a case study of Hohhot upper reservoir

Autor(en): (State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China)
(State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China)
ORCID (State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China)
(State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China)
(State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China, Xi’an University of Technology, Xi’an, China)
(PowerChina Beijing Engineering Corporation Limited, Beijing, China)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Health Monitoring
DOI: 10.1177/14759217241259967
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1177/14759217241259967.
  • Über diese
    Datenseite
  • Reference-ID
    10797462
  • Veröffentlicht am:
    01.09.2024
  • Geändert am:
    01.09.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine