Analysis of cost comparison and effects of change orders during construction: Study of a mass timber and a concrete building project
Author(s): |
Shafayet Ahmed
Ingrid Arocho |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Building Engineering, January 2021, v. 33 |
Page(s): | 101856 |
DOI: | 10.1016/j.jobe.2020.101856 |
- About this
data sheet - Reference-ID
10444184 - Published on:
05/10/2020 - Last updated on:
10/10/2020