Analysis of cost comparison and effects of change orders during construction: Study of a mass timber and a concrete building project
Auteur(s): |
Shafayet Ahmed
Ingrid Arocho |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Building Engineering, janvier 2021, v. 33 |
Page(s): | 101856 |
DOI: | 10.1016/j.jobe.2020.101856 |
- Informations
sur cette fiche - Reference-ID
10444184 - Publié(e) le:
05.10.2020 - Modifié(e) le:
10.10.2020