0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

기계굴착공법을 적용한 현장타설말뚝 시공시 부조화 발생요인 분석 및 대응 방안 (Analysis and Countermeasures for the Trouble Factors of the Spot Installation Pile Using Machine Excavation Method)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkic.2009.9.4.075.
  • About this
    data sheet
  • Reference-ID
    10762037
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine