기계굴착공법을 적용한 현장타설말뚝 시공시 부조화 발생요인 분석 및 대응 방안 (Analysis and Countermeasures for the Trouble Factors of the Spot Installation Pile Using Machine Excavation Method)
Auteur(s): |
Hong-Tae Park
Chang-baek Son |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), août 2009, n. 4, v. 9 |
Page(s): | 75-83 |
DOI: | 10.5345/jkic.2009.9.4.075 |
- Informations
sur cette fiche - Reference-ID
10762037 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024