프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구 (An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period)
Author(s): |
Ji-Hun Cho
Heung-Goo Cho |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), December 2009, n. 6, v. 9 |
Page(s): | 131-139 |
DOI: | 10.5345/jkic.2009.9.6.131 |
- About this
data sheet - Reference-ID
10762011 - Published on:
15/03/2024 - Last updated on:
15/03/2024