프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구 (An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period)
Auteur(s): |
Ji-Hun Cho
Heung-Goo Cho |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), décembre 2009, n. 6, v. 9 |
Page(s): | 131-139 |
DOI: | 10.5345/jkic.2009.9.6.131 |
- Informations
sur cette fiche - Reference-ID
10762011 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024