Administration of Construction Contract Interim Payments Based on Earned-Value Reduction Techniques
Author(s): |
Farah S. Demachkieh
(Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., Beirut 1107 2020, Lebanon.)
Mohamed-Asem U. Abdul-Malak |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, November 2019, n. 4, v. 11 |
Page(s): | 04519023 |
DOI: | 10.1061/(asce)la.1943-4170.0000309 |
- About this
data sheet - Reference-ID
10579944 - Published on:
08/03/2021 - Last updated on:
08/03/2021