Administration of Construction Contract Interim Payments Based on Earned-Value Reduction Techniques
Auteur(s): |
Farah S. Demachkieh
(Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., Beirut 1107 2020, Lebanon.)
Mohamed-Asem U. Abdul-Malak |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, novembre 2019, n. 4, v. 11 |
Page(s): | 04519023 |
DOI: | 10.1061/(asce)la.1943-4170.0000309 |
- Informations
sur cette fiche - Reference-ID
10579944 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021