0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

About designing the internal layout grid of the main NPP building

Author(s):


Medium: journal article
Language(s): English
Published in: IOP Conference Series: Materials Science and Engineering, , n. 4, v. 913
Page(s): 042040
DOI: 10.1088/1757-899x/913/4/042040
Abstract:

When carrying out the construction and installation works of nuclear power facilities, one of the main stages of geodetic work at a construction site is the creation of a layout grid. The article considers the issue of designing an internal layout grid at the source and installation horizons. It is proposed to use the free stationing method when creating the internal layout grid. A model of the internal circuit in the reactor building was created and accuracy pre-calculation was performed.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1757-899x/913/4/042040.
  • About this
    data sheet
  • Reference-ID
    10675109
  • Published on:
    29/05/2022
  • Last updated on:
    29/05/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine