0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

About designing the internal layout grid of the main NPP building

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Materials Science and Engineering, , n. 4, v. 913
Page(s): 042040
DOI: 10.1088/1757-899x/913/4/042040
Abstrait:

When carrying out the construction and installation works of nuclear power facilities, one of the main stages of geodetic work at a construction site is the creation of a layout grid. The article considers the issue of designing an internal layout grid at the source and installation horizons. It is proposed to use the free stationing method when creating the internal layout grid. A model of the internal circuit in the reactor building was created and accuracy pre-calculation was performed.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1757-899x/913/4/042040.
  • Informations
    sur cette fiche
  • Reference-ID
    10675109
  • Publié(e) le:
    29.05.2022
  • Modifié(e) le:
    29.05.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine