0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

공동주택 철근콘크리트 공사 작업지연요인에 관한 연구 (A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkic.2009.9.2.055.
  • About this
    data sheet
  • Reference-ID
    10762066
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine