공동주택 철근콘크리트 공사 작업지연요인에 관한 연구 (A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction)
Auteur(s): |
Hyun-Chul Lee
So-Yean Lim Sang-Ku Yeo Seong-Seok Go |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), avril 2009, n. 2, v. 9 |
Page(s): | 55-61 |
DOI: | 10.5345/jkic.2009.9.2.055 |
- Informations
sur cette fiche - Reference-ID
10762066 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024