조선시대 화성성역의 공정관리 사례분석 (A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkic.2008.8.6.139.