Kyoon-Tai Kim
- 유닛모듈러 건축구조물의 수평 정밀도 확보를 위한 Pre-Fab 독립기초 높이조절 공법 개발 (Development of a Height Adjustment Method of Prefabricated Individual Footing for the Leveling of Unit Modular Structural System). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 6 (December 2015). (2015):
- 비선형 예측모형을 활용한 모듈러주택 시장전망 (Prospecting the Market of the Modular Housing Using the Nonlinear Forecasting Models). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 6 (December 2014). (2014):
- 벡터사진 정보와 BIM을 활용한 건축물의 시공·유지관리 이력관리기술 (History Management Technology of Building Construction and Maintenance Using Vector Photo Information and BIM). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 6 (December 2014). (2014):
- 벡터사진 활용을 통한 시공정보 관리모듈 개발 (Development of Construction Information Management Module through the Use of Vector-Photo). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 6 (December 2013). (2013):
- Development and Evaluation of Fixation Equipment for Transporting Unit Modules. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 6 (December 2013). (2013):
- 초고층 건축물 외벽 청소로봇 운용을 위한 가이드레일 개념(안) 개발 (Conceptual design development of Guide Rail for Cleaning Robot in Curtain Wall Facade of Skyscraper). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 2 (April 2012). (2012):
- Development of a Musculoskeletal Load Measuring Device for Construction Workers Based on Accelerometers and Gyro Sensors. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 11, n. 6 (December 2011). (2011):
- Development and Verification of Technical Criteria for a U-Bridge. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 5 (October 2010). (2010):
- 화성건설공사에서 자재의 조달방법 연구 (A Study on Procurement of Construction Materials in the HwaSeong Construction Project). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 6 (December 2009). (2009):
- 뿜칠내화피복 작업 자동화시스템을 위한 RTLS 기술 적용에 관한 연구 (A Study on the Application of RTLS Technology for the Automation of Spray-Applied Fire Resistive Covering Work). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 5 (October 2009). (2009):
- 건축공사현장의 안전관리 모니터링을 위한 USN 기술 적용에 관한 연구 (A Study on the Implementation of USN Technologies for Safety Management Monitoring of Architectural Construction Sites). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 4 (August 2009). (2009):
- 조선시대 화성성역의 공정관리 사례분석 (A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 6 (December 2008). (2008):
- 건설분야 R&D 활성화 전략 수립을 위한 기초연구 (Fundamental Study for Establishing the Research and Development Encouragement Strategy in Construction Area). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 4 (August 2008). (2008):
- Development of L-Type Fixation Equipment for Transporting Unit Modules. In: Journal of Civil Engineering and Architecture, v. 9, n. 12 (December 2015). (2015):
- Development of a life cycle cost estimate system for structures of light rail transit infrastructure. In: Automation in Construction, v. 19, n. 3 (May 2010). (2010):
- A comparison of two innovative technologies for safe pipe installation — "Pipeman" and the Stewart–Gough platform-based pipe manipulator. In: Automation in Construction, v. 17, n. 3 (March 2008). (2008):
- Development of road stripe removing equipment using high-pressure water jet. In: Automation in Construction, v. 15, n. 5 (September 2006). (2006):
- Experimental Evaluation of Fixing Equipment for Improving the Efficiency of Modular Unit Systems. In: Journal of Building Construction and Planning Research, v. 2, n. 4 ( 2014). (2014):