15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel
Author(s): |
Andrea Lussu
Sebastian Grüllich Christian Kaiser Adrian Fontana |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geomechanics and Tunnelling, October 2019, n. 5, v. 12 |
Page(s): | 595-603 |
DOI: | 10.1002/geot.201900039 |
Structures and Projects
- About this
data sheet - Reference-ID
10380175 - Published on:
14/11/2019 - Last updated on:
14/11/2019