Andrea Lussu
- Tunnelling in complex geological structures during the construction of the Brenner Base Tunnel. In: Geomechanics and Tunnelling, v. 17, n. 6 (December 2024). (2024):
- 15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel. In: Geomechanics and Tunnelling, v. 12, n. 5 (October 2019). (2019):