Widening and Upgrading of the 77-years old Y-Bridge in Ho-Chi-Minh City

 Widening and Upgrading of the 77-years old Y-Bridge in Ho-Chi-Minh City
Author(s): , , , ,
Presented at IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, published in , pp. S21-111
DOI: 10.2749/nantes.2018.s21-111
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.36 MB

Built in 1941 and strengthened for the first time is 1992, the Y-Bridge in Ho Chi Minh City (Vietnam) is set to be widened and upgraded in 2018, doubling its capacity from 2 to 4 lanes and making i...
Read more

Bibliographic Details

Author(s): (Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet Vietnam, Ho-Chi Minh, Vietnam)
(Freyssinet Vietnam, Ho-Chi Minh, Vietnam)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Published in:
Page(s): S21-111 Total no. of pages: 7
Page(s): S21-111
Total no. of pages: 7
DOI: 10.2749/nantes.2018.s21-111
Abstract:

Built in 1941 and strengthened for the first time is 1992, the Y-Bridge in Ho Chi Minh City (Vietnam) is set to be widened and upgraded in 2018, doubling its capacity from 2 to 4 lanes and making it in compliance with current Vietnamese Design Specifications and loading. The complex deck structure, made of concrete T- or I-shaped girders, with drop-in steel I-girder spans required various and adaptable strengthening solutions (external post-stressing, shotcrete, FRP) depending on the type and configuration of the deck. Substructure is strengthened and upgraded using reinforced shotcrete, while new piles and micropiles are cast and connected to the substructure using transverse jacking beams and external post-tensioning bars. The challenge for this project is technical, since the bridge capacity is increased for the second time, and logistical, since only a reduction of traffic during works is allowed.