Widening and Upgrading of the 77-years old Y-Bridge in Ho-Chi-Minh City

 Widening and Upgrading of the 77-years old Y-Bridge in Ho-Chi-Minh City
Autor(en): , , , ,
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S21-111
DOI: 10.2749/nantes.2018.s21-111
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.36 MB

Built in 1941 and strengthened for the first time is 1992, the Y-Bridge in Ho Chi Minh City (Vietnam) is set to be widened and upgraded in 2018, doubling its capacity from 2 to 4 lanes and making i...
Weiterlesen

Bibliografische Angaben

Autor(en): (Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet International, Rueil-Malmaison, France)
(Freyssinet Vietnam, Ho-Chi Minh, Vietnam)
(Freyssinet Vietnam, Ho-Chi Minh, Vietnam)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S21-111 Anzahl der Seiten (im PDF): 7
Seite(n): S21-111
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/nantes.2018.s21-111
Abstrakt:

Built in 1941 and strengthened for the first time is 1992, the Y-Bridge in Ho Chi Minh City (Vietnam) is set to be widened and upgraded in 2018, doubling its capacity from 2 to 4 lanes and making it in compliance with current Vietnamese Design Specifications and loading. The complex deck structure, made of concrete T- or I-shaped girders, with drop-in steel I-girder spans required various and adaptable strengthening solutions (external post-stressing, shotcrete, FRP) depending on the type and configuration of the deck. Substructure is strengthened and upgraded using reinforced shotcrete, while new piles and micropiles are cast and connected to the substructure using transverse jacking beams and external post-tensioning bars. The challenge for this project is technical, since the bridge capacity is increased for the second time, and logistical, since only a reduction of traffic during works is allowed.