West Gate Bridge Strengthening Project - The Development of Novel Stiffened Panel Solutions
|
Bibliographic Details
Author(s): |
Chris Murphy
Emad Gad Robert Percy |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Published in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 895-902 | ||||
Total no. of pages: | 8 | ||||
DOI: | 10.2749/222137912805111267 | ||||
Abstract: |
This paper describes the structural assessment work carried out by the West Gate Bridge Strengthening Alliance ("WGBSA") on the West Gate main cable-stayed bridge in devising the necessary strengthening measures for stiffened panels whilst minimizing the need to remove red- lead paint. As a consequence of this work, questions have been raised as to the safety of various stiffener buckling clauses in UK assessment code BD 56[1],[2] and BS 5400 Part 3[3]. The authors discuss the answers to these questions that were able to be addressed within the time-frame of the West Gate strengthening project. Additional issues which require future research are documented at the end of the paper. |
||||
Keywords: |
box girder bridges torsional buckling Cable stayed bridges steel bridge strengthening stiffened panels bulb flat stiffeners non-linear finite element modelling
|