West Gate Bridge Strengthening Project - The Development of Novel Stiffened Panel Solutions
|
Bibliografische Angaben
Autor(en): |
Chris Murphy
Emad Gad Robert Percy |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Veröffentlicht in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Seite(n): | 895-902 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
DOI: | 10.2749/222137912805111267 | ||||
Abstrakt: |
This paper describes the structural assessment work carried out by the West Gate Bridge Strengthening Alliance ("WGBSA") on the West Gate main cable-stayed bridge in devising the necessary strengthening measures for stiffened panels whilst minimizing the need to remove red- lead paint. As a consequence of this work, questions have been raised as to the safety of various stiffener buckling clauses in UK assessment code BD 56[1],[2] and BS 5400 Part 3[3]. The authors discuss the answers to these questions that were able to be addressed within the time-frame of the West Gate strengthening project. Additional issues which require future research are documented at the end of the paper. |
||||
Stichwörter: |
Hohlkastenbrücken
|