Chris Murphy
- Keeping the builder honest: an analysis of recent building code initiatives in New Zealand. In: Architectural Science Review, v. 57, n. 4 (Oktober 2014). (2014):
- Building control changes: the on-going battle against the leaking building. In: Architectural Science Review, v. 54, n. 2 (Mai 2011). (2011):
- (2012): West Gate Bridge Strengthening Project - The Development of Novel Stiffened Panel Solutions. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2012): West Gate Bridge Strengthening Project - The Strengthening of Bolted Splices and the use of Torshear Type Bolts. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2012): West Gate Bridge Strengthening Project - Strengthening of the Main Cable Stayed Bridge. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2014): M48 Severn Crossing, UK. Wye Bridge / Beachley Viaduct Rocker Replacement. Vorgetragen bei: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- The Design and Construction of the Stadium Footbridge, St Helens, Uk. Vorgetragen bei: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):