West Gate Bridge Strengthening Project - The Strengthening of Bolted Splices and the use of Torshear Type Bolts

 West Gate Bridge Strengthening Project - The Strengthening of Bolted Splices and the use of Torshear Type Bolts
Autor(en): , , ,
Beitrag für 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, veröffentlicht in , S. 887-894
DOI: 10.2749/222137912805111285
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB

The West Gate Steel Bridge (WGB) was completed in 1978 and is distinct from other bridges of similar type and vintage in that it makes extensive use of bolted rather than welded connections. The ma...
Weiterlesen

Bibliografische Angaben

Autor(en):



Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Veröffentlicht in:
Seite(n): 887-894 Anzahl der Seiten (im PDF): 8
Seite(n): 887-894
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/222137912805111285
Abstrakt:

The West Gate Steel Bridge (WGB) was completed in 1978 and is distinct from other bridges of similar type and vintage in that it makes extensive use of bolted rather than welded connections. The main girder comprises trapezoidal box sections joined at 53 locations across the bridge using high-strength friction grip (HSFG) bolted plate splices on the bottom flange and webs.

All bolted connections originally employed a proprietary waisted shank bolt and during the recent strengthening works, a total of 84 cell splices were upgraded to meet modern code requirements. Torshear Type Bolts (TSBs) to JSS-II-09 (often confusingly known as Tension Control Bolts) were chosen as the replacement bolt type. By the close of the project, approximately 450,000 new bolts had been installed, 96% of which were TSBs. This report describes the findings of several tests carried out over a 30-month period to verify bolt performance.

Stichwörter:
Brücke Verstärkung

Bauwerke und Projekte